CAM-110 confirms active rodent infestation in the attic at 7 Mira Loma Rd. Over 5 days of monitoring, 7 confirmed detections have been recorded across 3 separate nights. Activity peaks between 19:00–21:00 PT (7 of 7 events nocturnal), with one pre-dawn detection at 05:39 AM on May 8 indicating established nesting behavior.
The UV tracking station and one-way door have not yet been installed. Camera is operating in baseline-only mode. Scheduling the one-way door installation is the immediate priority — active infestation is confirmed.
Generated · May 11, 2026 · Day 5 field analysis