Field Site Report · CAM-110
Roberta Draheim
Location pending confirmation · Bay Area, CA
CAM-110
Installation Scheduled
Days Active
0
Install: May 7, 2026
Detections
Awaiting baseline
UV Confirms
Awaiting baseline
Door Events
Awaiting baseline
Exclusion Progress
Day 0 · InstallWeek 2Week 5Week 10 · Target
AI Analysis
Awaiting Field Data
Site CAM-110 is scheduled for installation on May 7, 2026. Baseline data collection will commence immediately following camera deployment and one-way door installation. AI analysis will generate automatically once initial detection data is recorded.

Expected metrics upon activation: nocturnal activity patterns, UV trail confirmation rate, and door traversal frequency per 24-hour cycle.
Generated · May 4, 2026 · Pre-installation baseline
Recommendations
01
Confirm Installation Appointment
Verify the May 7, 2026 installation window is confirmed with the client. Ensure access to all identified entry points — attic, crawlspace, and perimeter gaps noted during initial assessment.
Pre-Install
02
Photograph Entry Points
Before sealing, document all active entry points with timestamped photos. Baseline photographic evidence is required for DPR and CDFA grant reporting and must be archived per protocol.
Pre-Install
03
Configure Camera Alerts
Set up Tactacam REVEAL app notifications for CAM-110. Enable motion trigger alerts and cellular upload interval. Confirm image transmission before leaving the site on install day.
Technical
Detection Trend
Detections
UV Confirms
Door Events
Data collection begins · May 7, 2026
Photo Evidence
Activity Log
DateTimeEvent TypeNotes
No activity recorded yet · Installation pending